PA COIL COAXIAL AND DC CABLE
Prerequisites
Figure 1. DO NOT TAKE THE TABLE BEYOND THE MARKED LINE

Procedure
- Turn the system power OFF. Refer to .
- Remove the FRP Covers of the Table.
- Remove the scissor covers from the table. SCISSOR COVERS
- Remove the cable cramp and track and remove cables.
Figure 2. Cable cramp and track

-
Snap open cable clamp.
Figure 3. Snap open cable clamp

-
Snap open cable track at end link.
Figure 4. Snap open cable track at end link

-
Snap open cable track.
Figure 5. Snap open cable track

-
- Remove the Cradle from the table. Refer to Posterior Array Coil Replacement without removing Fixed Table
- Disconnect the Control Board Cable-2 (TEB Cable) Assembly to
the connector box.
Figure 6. Disconnect the Control Board Cable-2

- Disconnect the Control Board Cable (TEB Cable) Assembly to the
connector box.
Figure 7. Disconnect the Control Board Cable

- Now open the Cable track to the total length.
Figure 8. Open the Cable track

- Remove the Support Block from the table.
Figure 9. Remove Support Block

- Remove the cables from the cable track and Table. Now the Control
board cable assembly is free to remove from table.
Figure 10. Remove the cables

- Place the new Control board cable assembly on the open Cable
track to the total length.
Figure 11. Place the new Control board cable

- Ensure proper projection length is given for the connection.
Figure 12. Ensure proper projection length

- Press the Cable Track keeping the cable inside the Track.
Figure 13. Connect the Shorter length end of the cable

- Rout the cables in the table and wind the spiral tube around
all Assemblies.
Figure 14. Rout the cables

- Connect the Control Board Cable (TEB Cable) Assembly to the
connector box.
Figure 15.

- Connect the Control Board Cable-2 (TEB Cable) Assembly to the
connector box.
Figure 16. Control board cable

- Restore Cradle Assy.
- Fix the scissor covers to the table. Refer to SCISSOR COVERS.
- Move the Fixed Table and install to Dock Frame.
- Connect the Cables to the MR Gantry.
- Fix the FRP Covers of the Table.
1 Finalization
Procedure
- Tuen the system Power ON. refer to Lockout / Tagout for System Cabinet PDU Main Breaker.
- Perform Express Coil MCQA Test